HIGHWAY 11 BUSINESS PARK

11 Feb, 2015

Capture2

Street Address

Highway 11 Business Park

City

Janesville

County

Rock County

Type of Space

Industrial

Min Size

224 acres

Max Size

224 acres

OwnershipEntire 224-acre site owned by City of Janesville

Master Site PlanAnd/or site plan illustrating exact dimensions and number of parcels for the specific site being submitted for certification

  • Buildable acreage: 224-acre contiguous, regular-shaped plot
  • Master site plan of Highway 11 Business Park submitted – conceptual site parcels delineated with acreages

Roadway access

  • Site fronts Hwy 11 to the north (4 lane) and County Rd. G/Beloit Ave. to the east (2 lane)
  • ~2 miles to I-39/90 via Hwy 11E (I-39/90 will reportedly be expanded to 6 lanes over the next 6 years; during construction County Rd. G on eastern site boundary will be widened to 4 lanes)
  • ~.5 mile to Hwy 51 via Hwy 11W

Rail Access

  • Not applicable

Commercial Airport AccessAccess to airport(s) with commercial air service

  • ~3 minute drive to Southern WI Regional Airport in Janesville, general aviation and cargo service only
  • ~50 minute drive to Dane County Regional Airport via I-39/90N
  • ~50 minute drive to Rockford International Airport via I-39/90S
  • ~1.5 hour drive to Mitchell Field via I-39/90S to I-43N
  • ~1.75 hour drive to O’Hare International Airport via I-39/90S

Freight Airport AccessAccess to airport(s) with freight air service

  • ~3 minute drive to Southern WI Regional Airport in Janesville – primarily cargo service
  • ~50 minute drive to Dane County Regional Airport – FedEx cargo service
  • ~50 minute drive to Rockford International Airport – primary cargo airport serving Janesville

Water / Electric Utility InfrastructureProximate electric power infrastructure availability and capacities

  • Alliant Energy & WI Power and Light serve site – 600MW combined-cycle natural gas power plant between Janesville and Beloit
  • Venture Substation ~.5 mile NE of site is fed by 138kV ATC transmission line ~2,500 ft. from eastern site boundary; 25MVA transformer with current peak load of 7.5 MVA; serves the Hwy 11 BP via a 12kV distribution line that is heavily loaded
  • Venture substation was built with 5 bays, 2 of which are occupied
  • Tripp Substation ~.3 miles west of site along Hwy 11 has a 33 MVA transformer with current peak load of 12 MVA

Water / Wastewater InfrastructureProximate water and wastewater infrastructure availability and capacities

  • Water: City of Janesville operates 8 wells in the south zone, where site is located
  • Rock River Basin aquifer: 32 MGD total system capacity, average 12 MGD, peak of 18-19MGD
  • 16” 80 psi main runs along northern boundary of site along Hwy 11; Separate 16” main runs along Hwy 51 west of site; both of these lines have existing available capacity for a new user
  • Wastewater: 21” gravity sewer main runs along northern site boundary along Hwy 11, running west to wastewater treatment plant ~2.3 miles west of site at Rock River; the plant is permitted to treat up to 21 MGD (2011 peak usage of ~13 MGD)

Capture3

For More Information Contact;

Madison Region Economic Partnership

Michael Gay
615 E. Washington Avenue

P.O. Box 71
Madison, WI 53701-0071
Phone
–  608.443.1953
michaelg@madisonregion.org
www.madisonregion.org

 